Wednesday, November 14, 2007

Post, beam & septic

The guys plumb up the box posts. The posts are used for mounting windows and doors. The windows are set inside the posts and the straw bales are set between them. The posts are 16" wide. After they are plumbed they set the bond beam on top and it and we are ready for the trusses.
Meanwhile our friends Norbert Vigil and his son Norbie install our septic system. They were able to clear the large area required for the drain field without removing any trees. We got the inspection
and they backfilled it by lunch today.

No comments: