After much head scratching Ivy and I figured out how to frame the curved breakfast nook. It will have 5 windows when we are done.
Sunday, November 18, 2007
Adobe wall & round room
After much head scratching Ivy and I figured out how to frame the curved breakfast nook. It will have 5 windows when we are done.
Wednesday, November 14, 2007
Post, beam & septic
Meanwhile our friends Norbert Vigil and his son Norbie install our septic system. They were able to clear the large area required for the drain field without removing any trees. We got the inspection
Monday, November 12, 2007
Window frames
Wednesday, November 7, 2007
Out of the ground
Monday, November 5, 2007
Lets build this house
Wednesday, October 31, 2007
The pour
Thursday, October 25, 2007
The heat is on
We got our foundation inspection today. Now we are laying tubing for radiant heat. We laid it a 6" on center. That is a lot of tubing but it will operate at a lower temperature and provide a lot of storage do we can use solar hot water panels to heat the house. We have scheduled our pour for next Wednesday.
Subscribe to:
Posts (Atom)